ESTIMASI PEMBEBANAN TRANSFORMATOR GARDU INDUK 150 KV
Keywords:
Power demand, transformer capacity, exponential trendAbstract
Development of an area, such as Yogyakarta is directly proportional to consumption of power in that area. Transformer of 150 KV Wirobrajan substation, 60 MVA, is one of main equipment in power system. Load forecasting on this research using daily average peak load data during five years that is since 2003 to 2008. Based on the analysis of the result of exponential model approach method, the equation Y = 5.29 e 0.04057X is obtained. By using this model, it is found that average load growth forecasting of the transformer during 2009 to 2025, is suitable to supply 50.89 MVA of load demand (85% of full load). Moreover,
model Y = 20.18 + 0.44X1 + 0.07X2 is found using polynomial method. In 2025, the transformer, based on polynomial method,
can deliver power 80.07 MVA (about 80.07% of full load). Finally, load current was 230.72 A, in 2025.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2013 Elias K. Bawan
This work is licensed under a Creative Commons Attribution 4.0 International License.