ANALISIS KETIDAKSEIMBANGAN BEBAN DAN RUGI DAYA AKIBAT ARUS NETRAL DI PENYULANG GI GORONTALO BARU

Authors

  • Mohammad Rifaldi
  • Yasin Mohamad
  • Rahmat Hidayat Dongka
  • Ade Irawaty Tolago
  • Arifin Matoka

DOI:

https://doi.org/10.54757/fs.v15i2.844

Keywords:

Distribution transformer, Electrical distribution system, Load unbalance, Neutral current, Power losses

Abstract

The State Electricity Company (PT.PLN Persero) is a company authorized by the government to handle electricity in Indonesia. Distribution lines are an important component in the distribution of electrical power, therefore power losses in distribution lines must be small so that the received electrical power must be close to the transmitted electrical power. This study discusses electrical power losses and load imbalances in the 20 KV medium voltage primary distribution line at the Gorontalo Baru Substation (GOBAR) feeder. The method used in this study is through data collection of load current measurements for each phase, neutral current (N), and neutral conductor resistance (RN) from seven feeders with a total of 297 distribution transformers. The data is processed using the load imbalance equation and active power loss calculations. The analysis is carried out by comparing the imbalance value to the PLN standard (SK ED PLN No. 0017.E/DIR/2014). The results of the study show that the number of transformers in the GOBAR GI feeder that have an imbalance value exceeding the standard limit or in the bad category is 71 transformers and the amount of power losses experienced by the GOBAR GI is 1423.01 kW outside peak load times and for peak load times of 3051.115 kW. Judging from these losses, so that inter-phase load balancing is an important step in increasing the efficiency and reliability of the electric power distribution system.

References

Yuslizar, yasin M., T. Ismail (2024), “analysis of voltage drop and power losses on medium voltage 20 kv distribution system kotamobagu area supplied from pltd,” vol. 9, no. 1, pp. 79–88

I. Amu, Yasin Mohamad, A. Irawaty. (2019). “kajian kelayakan operasi pecah beban penyulang beta ( sj-2 ) untuk kehandalan sistem kelistrikan,”

P. Igo, Yasin M., T. Ismail. (2023). “Analisis Keandalan Jaringan Distribusi 20kV Pada ULP Toili Berdasarkan saidi dan saifi,” vol. 5, pp. 197–203.

R. M. L. Moh, H. Steven, and A. Muh. (2024). “pengaruh ketidakseimbangan beban terhadap arus netral dan rugi-rugi daya pada trafo distribusi gardu gls 084, 50 kva di desa polohungo” vol. 13, no. November, pp. 151–156.

A. P. Siregar, A. D. Tarigan, and Z. Lubis. (2024). “Analisis Ketidakseimbangan Beban Akibat Penghantar Netral Jaringan Distribusi Skunder,” vol. 13, no. 3, pp. 298–301.

H. WIDIARTO and A. SAMANHUDI. (2022). “Analisa Ketidakseimbangan Beban Transformator Distribusi Pada Gardu 1a Politeknik Penerbangan Indonesia Curug,” Knowl. J. Inov. Has. Penelit. dan Pengemb., vol. 2, no. 2, pp. 157–167.

M. Irsyam, M. Algusri, and L. P. Marpaung. (2023).“Analisa Rugi-Rugi Daya (Losses Power) Pada Jaringan Tegangan Rendah Pt. Musimas Batam,” Sigma Tek., vol. 6, no. 1, pp. 109–116.

R. D. Lestari. (2019).“Analisis Pengaruh Ketidaksimbangan Beban Trafo 3 Fasa Terhadap Susut Daya Pada Jaringan Distribusi PT PLN ULP Manahan,” pp. 1–20.

D. Rika Widianita. (2023).“analisis rugi-rugi daya akibat ketidakseimbangan beban pada transformator ultg panakkukang,” at-tawassuth J. Ekon. Islam, vol. VIII, no. I, pp. 1–19.

A. B. Prayoga and B. Suprianto. (2023).“Analisis Pengaruh Ketidakseimbangan Beban Pada Transformator Distribusi Terhadap Rugi Daya (Losses) Dengan Digsilent Power Factory di PT.PLN (Persero) ULP Ngunut,” J. Tek. Elektro, vol. 12, no. 2, pp. 23–32.

Zulkhulaifah, Bakhtiar, and H. Rudito. (2021). “Analisis Pengaruh Ketidakseimbangan BebanTrafo Distribusi 20 Kv Terhadap Rugi-Rugi Daya dan Efisiensi pada Penyulang Hertasning Baru PT PLN (Persero) ULP Panakukkang Makassar,” Pros. Semin. Nas. Tek. Elektro dan Inform., no. September, pp. 1–6.

B. D. Setiawan and H. S. R. Pili. (2023) “Analisis Ketidakseimbangan Beban Pada Trafo Distribusi Mh 196 Menggunakan Etap 19 Di Ulp Medan Helvetia,” Pros. Konf. Nas. Soc. Eng. Polmed, vol. 4, no. 1, pp. 628–636.

Frengki Surusa, Q. Aini, A. I. Pratiwi, Y. Mohamad. (2024). “Analisis Susut Non Teknis Akibat Gangguan pada kWh Meter PT . PLN UP3 Gorontalo,” vol. 6.

Moh. Andriansyah Maulana and Gatut Budiono. (2024). “Analisis Pengaruh Ketidakseimbangan Beban Terhadap Efisiensi Transformator di PDAM Surya Sembada Surabaya,” Jupiter Publ. Ilmu Keteknikan Ind. Tek. Elektro dan Inform., vol. 2, no. 2, pp. 243–259.

Downloads

Published

2025-11-30

How to Cite

[1]
M. Rifaldi, Y. Mohamad, R. H. Dongka, A. I. . Tolago, and A. . Matoka, “ANALISIS KETIDAKSEIMBANGAN BEBAN DAN RUGI DAYA AKIBAT ARUS NETRAL DI PENYULANG GI GORONTALO BARU ”, Fs, vol. 15, no. 2, Nov. 2025.

Issue

Section

Articles